Rejuvenation of Suswa River by interception and diversion of municipal drains and construction of STPs in area from Mothrawala to Shyampur

Rejuvenation of Suswa River by interception and diversion of municipal drains and construction of STPs in area from Mothrawala to Shyampur Last Modified: 31-May-2020 4:46 AM
  • 5
    Projects involving interception & diversion works (I&D works). The proposed drains for I&D works include:
  • #1
    Interception and Diversion of drains work at Nala Sapera Basti at a proposed cost of Rs. 37 lakhs.
  • #2
    Interception and Diversion of drains work at Nala near Rajiv Gandhi International Stadium bridge at a proposed cost of Rs. 109.35 lakhs.
  • #3
    Interception and Diversion of drains work at Nala Shyampur near Polytechnic at a proposed cost of Rs. 65.51 lakhs.
  • Rs. 211.86 lakhs
    Estimated cost of the 3 I&D works.
  • 3
    Number of Sewage Treatment Plants proposed to be constructed. These include:
  • #1
    STP at Nala Saperabasti with treatment capacity of 1.5 MLD at a proposed cost of Rs. 608.80 lakhs.
  • #2
    STP at Nala near Rajiv Gandhi International Stadium bridge with treatment capacity of 1.0 MLD at a proposed cost of Rs. 494.40 lakhs.
  • #3
    STP at Nala Shyampur near Polytechnic with treatment capacity of 5.0 MLD at a proposed cost of Rs. 1,062.80 lakhs.
  • Rs. 2,166 lakhs
    Estimated cost of setting up the 3 STPs.
  • Rs. 5815.16 lakhs
    Estimated costs for Operations and Maintenance for 15 years, land acquisition and other costs.