JJA Village Lake Desilting Project in Babhalgaon Village

JJA Village Lake Desilting Project in Babhalgaon Village Last Modified: 07-Oct-2015 7:54 AM
  • 27,000
    cubic metre of silt removed from the village water percolation tank at a cost of Rs 6.5 lakh in June 2013.
  • 0
    water tankers needed in 2014 as a result of the de-silting work.
  • Rs. 12 lakh
    saved per year based on the cost of water tankers sent to the village in 2013.
  • 250
    acres of land brought under irrigation.
  • 2 km
    radius in which groundwater recharged, wells and borewells filled